16x9_Simon and Ran (IMAGE) DOE/Argonne National Laboratory Caption Argonne’s Ran Hong, left, and Simon Corrodi, right, installing the calibration probe at the 4 Tesla Magnet Facility. Credit (Image by Mark Lopez/Argonne National Laboratory.) Usage Restrictions Original content License Original content Disclaimer: AAAS and EurekAlert! are not responsible for the accuracy of news releases posted to EurekAlert! by contributing institutions or for the use of any information through the EurekAlert system.