The PSL team assembling the Glass Bridge (IMAGE)
Caption
Members of the Polyhedral Structures Laboratory at the Weitzman School and collaborators from neighboring institutions fabricated the Glass Bridge over the course of 21 days. Their plans necessitated a wooden support designed by research assistant Boyu Xiao to hold the hollow glass units in place during assembly.
Credit
(Image: Courtesy of Polyhedral Structures Laboratory)
Usage Restrictions
Seek permission to redistribute from Polyhedral Structures Laboratory.
License
Original content