A robot is prepared to coat a power line at ORNL's PCAT test facility. (IMAGE)
Caption
The Prysmian robot is installed on a power line before dispensing its coating along the line at ORNL’s Powerline Conductor Accelerated Testing Facility.
Credit
Carlos Jones/ORNL, U.S. Dept. of Energy
Usage Restrictions
N/A
License
Original content